IF YOU SMELL GAS Do not try to light any appliance. Do not touch any electrical switch; do not use any phone in your building. Immediately call
ServiceStep 1: Turn off power and gas.Figure 5a.Figure 5b.Step 2: Remove 8 screws securing the outer cover of the power head. Figure 5c. Step 3: Cu
ServicePage 11XG0518 - 070714Figure 5h.Step 8: Using the large bell connector, connect the white ber wire from the power cable to the black wire from
Step 10: Using three supplied zap straps, neatly secure wiring. Make sure no wires can get caught in the motor or pinched.Figure 5j.Figure 5k.Figure
Motor and Capacitor ReplacementStep 1: Turn off power and gas.REC1255Figure 6a.ServicePage 13XG0518 - 070714Figure 6c.Step 4: Cut brown wire from mot
Step 7: Remove eight screws securing the motor plate to power head.Figure 6f.Figure 6g. Image 40Step 8: Lift motor assembly out.ServiceStep 9: Put n
ServicePage 15XG0518 - 070714Step 12: Using a supplied small bell connector, connect the black ber wire from the power cable to the blue wire from t
Step 17: Secure outer cover with supplied eight screws.Figure 6p.Service8 fasteners (4 oposite side)Outer CoverFigure 6o.Step 16: Check operation an
Page 17XG0518 - 070714NotesPVHEX58-300 & PVHEX510-300 Horizontal Power Vent
PVHEX58-300 & PVHEX510-300 Horizontal Power VentAppendix A: WarrantyThe WarrantyThe Companies warrants the Montigo Gas Appliance to be free from d
PVHEX58-300 & PVHEX510-300 Horizontal Power VentAppendix B: State of MassachusettsAmendment (Gas Fireplace / Equipment sold in the State of Massac
IntroductionSpecicationsPVHEX58-300 Horizontal Power Vent SystemSafety Alert KeyPage 2XG0517 - 070714General InformationThis installation guide cover
Ferndale, WashingtonTF: 1.800.789.6236FX: 1.866.3000.0927XG0517 - 050514Langley, British ColumbiaTF: 1.800.378.3115FX: 1.604.607.6462PVHEX58-300 &
PVHEX58-300 & PVHEX510-300 Horizontal Power VentProduct DimensionsIntroductionFigure 1. PVHEX58-300 & PVHEX510-300 (Tolerance ± ⅛") [mm]
Installing the Power vent 1514"389 1412"368 FramingWall boardRough in boxFigure 2. Framing dimensions (combustible material construction)In
InstallationPage 5XG0518 - 070714Step 3: Screw rough in box to wall. Figure 2e.Step 4: Remove six screws securing the electrical cover.Figure 2f.Ste
InstallationStep 8: Take the electrical harness (EPVH-10-100) that will commu-nicate with the Power vent and pass the cable through the slot in the r
InstallationPage 7XG0518 - 070714Step 16: Secure power head onto the rough in box with the supplied 4 screws. Make sure the power head makes good con
Wiring Diagram.InstallationCPower Vent WiringBLUEBROWNBLACKWHITEBLACKGREEN6 PIN MOLEXCONNECTORKEY WAYFigure 3. Power Vent Wiring DiagramConduit &
InstallationFigure 4.vvFIXEDCLOSEDOPERABLEFCBvvOPERABLEFIXEDCLOSEDvBXBABJHIXKvMVBLDEVINSIDECORNER DETAILvGAVVENTER TERMINALXAIR SUPPLY INLET AREA WHER
Comentarios a estos manuales